1887

Utilisation and Reliability of High Power Proton Accelerators

Workshop Proceedings, Mol, Belgium, 6-9 May 2007

image of Utilisation and Reliability of High Power Proton Accelerators

Accelerator-driven systems (ADS) are being considered for their potential use in the transmutation of radioactive waste. The performance of such hybrid nuclear systems depends to a large extent on the specification and reliability of high power accelerators, as well as the integration of the accelerator with spallation targets and sub-critical systems. At present, much R&D work is still required in order to demonstrate the desired capability of the system as a whole.

Accelerator scientists and reactor physicists from around the world gathered at an NEA workshop to discuss issues of common interest and to present the most recent achievements in their research. Discussions focused on accelerator reliability; target, window and coolant technology; sub-critical system design and ADS simulations; safety and control of ADS; and ADS experiments and test facilities. These proceedings contain the technical papers presented at the workshop as well as summaries of the working group discussions held. They will be of particular interest to scientists working on ADS development as well as on radioactive waste management issues in general.

English

SESSION V - ADS Experiments and Test Facilities

Nuclear Energy Agency

The GUINEVERE project is a European project in the framework of FP6 IP-EUROTRANS. The IP-EUROTRANS project aims at addressing the main issues for ADS development in the framework of partitioning and transmutation for nuclear waste volume and radiotoxicity reduction. The GUINEVERE project is carried out in the context of Domain 2 of IP-EUROTRANS, ECATS, devoted to specific experiments for the coupling of an accelerator, a target and a subcritical core. These experiments should provide an answer to the questions of on-line reactivity monitoring, subcriticality determination and operational procedures (loading, start-up, shutdown, etc.) in an ADS by 2009-2010. The GUINEVERE project will make use of the VENUS reactor, serving as a lead fast critical facility, coupled to a continuous beam accelerator. In order to achieve this goal, the VENUS facility has to be adapted and a modified GENEPI-C accelerator has to be designed and constructed. During the years 2007 and 2008, the VENUS facility will be modified in order to allow the experimental programme to start in 2009. The paper describes the main achievements with regard to the modifications for the VENUS facility.

English

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error